Energy solutions

Geoplin delivers energy efficient solutions in industries within bothtechnological lines and supporting processes and thus expands the long-term co-operation with its customers based on natural gas supply to investments in customers’ energy systems.

 

Key energy solutions developed by Geoplin

Exploitation of waste heat generated in production processes

- We identified a potential for exploitation of waste heat generated in the production process in many of our industry customers the core business of which is production of finished or semi-manufactured products.

- The implementation of the solution generates savings that reduce our customers’ operating costs compared to their original systems. We use our expert knowledge and work with our customers to develop a proposition of the technological solution and implement it.

- Our customers do not bear costs related to the development and implementation of the solution nor the maintenance costs within the contract period. All these costs are already included in Geoplin’s service.

Our references in exploitation of waste heat generated in production processes:

IAK, Industrija apna Kresnice (lime production company)

• The installation of a special custom made heat exchanger for recapturing exhaust gas waste heat and putting it to use in the technological process allowed our customer IAK to improve production process efficiency by more than 20% and make energy savings.

• The direct effects of this solution are lower energy costs and reduced impact of weather conditions on production quality. Nominal thermal power of the installed heat exchanger is 4.5 MW.

 

Optimization of technological processes

- Energy costs may represent a big share of the total costs to the business of energy-intensive industries. Beside energy efficiency, our customers also face the need to optimise the costs of technological processes in order to increase their competitiveness.

- That is why we strive tdevelop solutions that allow our customers not only to be more energy efficient but, above all, to optimise their technological process. Our solutions take into account both of these aspects.

Our references in optimisation of technological processes:

IAK, Industrija apna Kresnice (lime production company)

• Together with both our customer specialising in lime production, and a technology partner, we developed a solution for expanding combustion zone in a furnace, which is an elementary part of the technological plant for lime production.

• The solution increased production capacity and at the same time reduced specific energy use per unit of product. Manufacturing of a unit of product is thus quicker, more cost-effective and its negative impact on the environment is lower.

Štore Steel

• Working closely with our customer from steel industry – Štore Steel, and an outsourced technology partner, we developed a solution for the technological process of baking of steel bars.

• Due to modern technology, the customer was able to reduce natural gas consumption and improve the welfare of employees at their workplaces.

• The technological solution enables the recuperation of exhaust gas from furnaces and better thermal insulation. The new process control system made the production process quicker, more cost-effective and more employee and environmentally friendly. Lower energy consumption leads to lower CO2 and other greenhouse gas emissions.

Perutnina Ptuj – mesna industrija Zalog (meat processing industry):

• The production process of our customer from meat processing industry, Perutnina Ptuj – mesna industrija Zalog, showed potential for lower electricity consumption, namely in the production of cooling energy needed for deep-freezing.

• Together with our technology partner, we developed a solution consisting of brine set at different temperatures that are required for the production at the Zalog plant.

• The outcome are lower electricity costs and lower electricity consumption made possible by the increase of cooling efficiency (EER) from 1.5 to 4.5. The new parallel cooling system also provided relief to the existing cooling system.

• The investment was entirely covered by Geoplin and allowed the customer not only to generate energy savings but also to acquire additional cooling power sufficient for the planned capacity expansion.

• The investment led to environmental benefits and reduced CO2 emissions.

More at: https://www.geoplin.si/en/news/modernisation-perutnina-ptujs-cooling-system

 

We develop many other energy solutions

Highly energy-efficient combined heat and power generation plants

-  Industrial companies using natural gas for heat generation for process, steam and hot water production may substantially improve their energy system’s overall efficiency by installing a cogeneration plant (CHP). 

-  Installation of a CHP plant not only reduces energy costs but it also represents a redundancy to existing heat source or steam production, or represents a local high efficiency production power generation plant. 

Our references in highly energy-efficient co-generation plants:

Zdravilišče Radenci (health resort) and Mercator (retail store)

 

Cooling systems for technological cooling

- Cooling is in many industries key to successful production. 

- Substantial savings can be made by replacing existing technologies with more advanced ones. At the same time, new technologies lead to better reliability of systems and a positive contribution to environment.

- A reconstruction of a cooling system comprising an adequate combination of technology, cooling medium, accumulation of cooling energy and high operating hours allows for one of the shortest pay-back periods in comparison to other energy efficiency measures.

 

Professional industrial lighting systems

- Adequate illumination of workplaces is one of the most important conditions for efficient and safe production process.

- Geoplin’s solutions for industrial lighting systems are developed in co-operation with renowned technology partners, which ensures that proposed technical solutions meet the customer’s requirements and are compliant with the standards and regulations of the Health and Safety at Work Act.

- Our references prove that positive effects of reconstruction of lighting systems in our customers from industries are cost reduction and mostly better efficiency, job satisfaction of employees at workplaces and fewer occupational injuries.

Our references in professional industrial lighting systems:

Metal Ravne

• The Metal Ravne project consisted of planning, implementation and financing of the reconstruction of the existing industrial lighting in the production hall.

• The project was implemented through energy service contracting, meaning that Geoplin as the contractual partner developed implemented and financed the investment and guaranteed both energy savings and the agreed illumination of the workplaces to the customer.  During the 60-month contractual period, Geoplin’s solution will save the customer 825 MWh of electrical energy yearly and reduce their carbon footprint by 454 tons of CO2 a year.

Štore Steel

More at: https://www.geoplin.si/en/news/another-geoplins-energy-efficient-lighting-project

 

Why choose Geoplin?

Team of experts

You will be working on the development of the project solution with a team of experts with an excellent record of accomplishment. Solutions for complex projects will be developed together with your in-house experts and outsourced technology partners in order to find the best answer to your problem.

Benefits for customers

Great emphasis is placed on careful preparation of the project, including in-depth technical and economic analysis of the existing technology and establishment of the customer’s requirements. All this results in finding an optimum solution based on your requirements and goals set in the terms of reference.

Presentation of energy solution

The proposed solution is presented in the form of an energy-economic analysis destined to speed up the decision making process on the project. To demonstrate the effects of the proposed solution we use comparative analyses since we believe that positive effects of similar solutions implemented in our customers are our best reference.

Turnkey solutions

We make sure that the solution the scope of which is defined in detail in the terms of reference is implemented professionally and that only high-quality products are used. We take care of the entire investment – from project concept to operating permit. We also maintain the equipment and system within the entire contract period.

Performance and equipment guarantee

Energy-supply contracting model includes the transfer of all operational risks to Geoplin, including performance and equipment guarantee.

No maintenance costs

The customer has no maintenance costs during the contractual period, since the payment of these costs is part of a comprehensive service offered by Geoplin.

Evaluation of energy solutions and customer advice

After the solution has been implemented, we periodically send you reports summarising the positive effects of the solution by using energy management system, and advise you on possible additional opportunities for cost optimisation.

Lower energy consumption and financial savings

Customers repay the investment from achieved energy savings, whereas the initial investment and operating costs are covered by Geoplin.

Energy savings buyback

If you carried out an energy efficiency measure by yourself and using your own resources, Geoplin is prepared to buy back the achieved energy savings in line with the Decree on Energy Savings at Final Customers.

Environmental benefits

Advanced energy solutions lead to environmental benefits.

 

Products and services

  • Natural gas-powered vehicles are more environmentally friendly.

    Natural gas-powered vehicles produce 20% to 30% less CO2 emissions. More
  • Natural gas releases 20% to 50% less CO2.

    Natural gas releases 25% to 50% less CO2 per unit of energy generated for home heating or industrial purposes. More
  • Natural gas has a higher conversion factor.

    Natural gas is more efficient than other fossil fuels in the production of electricity or heat. More
  • Natural gas achieves a high efficiency rate.

    Natural gas can achieve an efficiency rate of nearly 100%. More
  • What is natural gas?

    Natural gas is a fossil fuel formed by the decomposition of organic substances. More
  • Natural gas can be as much as 100 million years old.

    The age of natural gas derives from the decomposition of prehistoric animals and plants. More
Company Geoplin
Products and services
Natural gas
Company and environment